Back to Missions

Apollo 9

Apollo 9 tested the complete crewed Apollo spacecraft in Earth orbit from March 3 to 13, 1969. James McDivitt commanded the mission, David Scott piloted the command and service module Gumdrop, and Russell Schweickart served as lunar module pilot aboard Spider. The flight evaluated the docking tunnel, internal crew transfer, propulsion, life support, and structural behaviour of the joined spacecraft. McDivitt and Schweickart separated Spider from Gumdrop, operated its descent and ascent stages, and returned for rendezvous and docking with Scott. This demonstrated that the lunar module could function independently and rejoin the spacecraft that would bring its crew home. Schweickart also tested the portable life-support backpack outside the lunar module, although space sickness reduced the planned EVA programme. The crew completed the principal engineering objectives before Atlantic splashdown. Apollo 9 established the operational foundation for Apollo 10's lunar-orbit rehearsal and the later lunar landings.

Apollo 9
NASA · NASA content generally may be used for factual or informational purposes under NASA Images and Media Usage Guidelines; do not imply NASA endorsement and verify any third-party rights or protected marks. · Source
Follow this mission

Alerts are unavailable because this mission is no longer active.

Identity

Aliases
Apollo IXAS-504
Name
Apollo 9
Status
completed

Details

Astronauts
Description
Apollo 9 tested the complete crewed Apollo spacecraft in Earth orbit from March 3 to 13, 1969. James McDivitt commanded the mission, David Scott piloted the command and service module Gumdrop, and Russell Schweickart served as lunar module pilot aboard Spider. The flight evaluated the docking tunnel, internal crew transfer, propulsion, life support, and structural behaviour of the joined spacecraft. McDivitt and Schweickart separated Spider from Gumdrop, operated its descent and ascent stages, and returned for rendezvous and docking with Scott. This demonstrated that the lunar module could function independently and rejoin the spacecraft that would bring its crew home. Schweickart also tested the portable life-support backpack outside the lunar module, although space sickness reduced the planned EVA programme. The crew completed the principal engineering objectives before Atlantic splashdown. Apollo 9 established the operational foundation for Apollo 10's lunar-orbit rehearsal and the later lunar landings.
Destination
Earth orbit for the first crewed flight of the complete Apollo spacecraft and Lunar Module, including docking, propulsion, life-support, and EVA systems tests
End Date
1969-03-13
Launch Site
Outcome
Met all primary objectives and demonstrated the major systems needed for a lunar landing mission. Spider operated independently, separated its descent stage, and returned to dock with Gumdrop after ascent-stage flight. A shortened EVA tested lunar exploration equipment; spacecraft and crew returned safely to the Atlantic on March 13, 1969, following a ten-day engineering mission.
Programs
Start Date
1969-03-03
Vehicle Families

Links

Assets & Meta

Creation Time
June 29, 2026 at 05:36:58 UTC
Updated Time
October 29, 2026 at 15:38:18 UTC

Other

Affiliations
Space Stations
-
Vehicles
Apollo 9 - AeroVia