Back to Missions

Mercury-Redstone 1

Mercury-Redstone 1 was NASA’s first Mercury-Redstone qualification attempt. On November 21, 1960, the booster rose only a few inches before premature cutoff and settled back onto the pad; a ground-connector sequencing fault caused the failure.

Follow this mission

Alerts are unavailable because this mission is no longer active.

Identity

Aliases
Mercury-Redstone 1MR-1Mercury-Redstone qualification flightRedstone 1
Name
Mercury-Redstone 1
Status
failed

Details

Astronauts
-
Description
Mercury-Redstone 1 was NASA’s first Mercury-Redstone qualification attempt. On November 21, 1960, the booster rose only a few inches before premature cutoff and settled back onto the pad; a ground-connector sequencing fault caused the failure.
End Date
1960-11-21
Launch Site
Outcome
Premature booster cutoff left the vehicle upright on the pad; a ground-connector sequencing fault caused the qualification failure.
Programs
Start Date
1960-11-21
Vehicle Families

Links

Assets & Meta

Creation Time
August 15, 2026 at 05:38:39 UTC
Updated Time
August 15, 2026 at 05:38:39 UTC

Other

Affiliations
Space Stations
-
Vehicles