Back to Missions

STS-6

STS-6 was the first flight of Space Shuttle Challenger. Paul Weitz, Karol Bobko, Donald Peterson, and Story Musgrave launched on April 4, 1983, and returned to Edwards Air Force Base on April 9. Hydrogen leaks and engine work had delayed the mission, which also introduced lighter external-tank and booster hardware. The principal payload was the first Tracking and Data Relay Satellite, TDRS-1, deployed with an Inertial Upper Stage. An upper-stage malfunction left the satellite in an incorrect but stable orbit. Controllers subsequently used its own propulsion over several months to reach the required orbit, recovering a spacecraft intended to transform communications coverage for orbital missions. Peterson and Musgrave performed the Shuttle programme's first completed spacewalk, testing its EVA equipment and working procedures. The crew also supported electrophoresis, materials, radiation-monitoring, and lightning investigations. The flight combined a new orbiter's introduction with communications-infrastructure deployment and the practical beginning of Shuttle spacewalking operations.

STS-6
Follow this mission

Alerts are unavailable because this mission is no longer active.

Identity

Aliases
Space Transportation System-6TDRS-1/First Shuttle Space WalkChallenger STS-6
Name
STS-6
Status
completed

Details

Astronauts
Description
STS-6 was the first flight of Space Shuttle Challenger. Paul Weitz, Karol Bobko, Donald Peterson, and Story Musgrave launched on April 4, 1983, and returned to Edwards Air Force Base on April 9. Hydrogen leaks and engine work had delayed the mission, which also introduced lighter external-tank and booster hardware. The principal payload was the first Tracking and Data Relay Satellite, TDRS-1, deployed with an Inertial Upper Stage. An upper-stage malfunction left the satellite in an incorrect but stable orbit. Controllers subsequently used its own propulsion over several months to reach the required orbit, recovering a spacecraft intended to transform communications coverage for orbital missions. Peterson and Musgrave performed the Shuttle programme's first completed spacewalk, testing its EVA equipment and working procedures. The crew also supported electrophoresis, materials, radiation-monitoring, and lightning investigations. The flight combined a new orbiter's introduction with communications-infrastructure deployment and the practical beginning of Shuttle spacewalking operations.
End Date
1983-04-09
Landing Facility
Launch Site
Outcome
Challenger completed its maiden flight and returned safely to Edwards Air Force Base. Peterson and Musgrave performed the first Shuttle spacewalk, lasting about four hours 17 minutes. TDRS-1 was deployed successfully, but an Inertial Upper Stage malfunction left it below its intended orbit; controllers used the satellite's own propellant over subsequent months to reach its operational orbit.
Programs
Start Date
1983-04-04
Vehicle Families

Links

Assets & Meta

Creation Time
June 30, 2026 at 03:25:39 UTC
Updated Time
October 29, 2026 at 16:06:42 UTC

Other

Affiliations
Space Stations
-
Vehicles