Back to Missions

STS-75

STS-75 was Columbia's February-March 1996 Space Shuttle mission carrying the Tethered Satellite System Reflight and the third United States Microgravity Payload. Columbia launched from Kennedy Space Center's Launch Complex 39B on February 22 and landed on Runway 33 at the Shuttle Landing Facility on March 9. The seven-person crew included astronauts from NASA and ESA plus Italian payload specialist Umberto Guidoni. The joint NASA-Italian Space Agency TSS-1R experiment deployed more than 19 kilometers of tether and returned valuable electrodynamics and plasma measurements, including currents at least three times higher than predicted, before the tether broke short of full deployment and the satellite was lost. USMP-3 operated nominally, conducting materials-science and condensed-matter investigations through telescience during Columbia's extended mission.

Follow this mission

Alerts are unavailable because this mission is no longer active.

Identity

Aliases
Columbia STS-75TSS-1RTethered Satellite System ReflightUSMP-3STS 75
Name
STS-75
Status
completed

Details

Astronauts
Description
STS-75 was Columbia's February-March 1996 Space Shuttle mission carrying the Tethered Satellite System Reflight and the third United States Microgravity Payload. Columbia launched from Kennedy Space Center's Launch Complex 39B on February 22 and landed on Runway 33 at the Shuttle Landing Facility on March 9. The seven-person crew included astronauts from NASA and ESA plus Italian payload specialist Umberto Guidoni. The joint NASA-Italian Space Agency TSS-1R experiment deployed more than 19 kilometers of tether and returned valuable electrodynamics and plasma measurements, including currents at least three times higher than predicted, before the tether broke short of full deployment and the satellite was lost. USMP-3 operated nominally, conducting materials-science and condensed-matter investigations through telescience during Columbia's extended mission.
End Date
1996-03-09
Landing Site
Launch Site
Outcome
Partial payload success: TSS-1R returned valuable electrodynamics and plasma data before its tether broke and the satellite was lost, while USMP-3 operated nominally and completed its microgravity investigations.
Program
Space Shuttle program
Start Date
1996-02-22
Vehicle Families

Links

Assets & Meta

Creation Time
April 26, 2026 at 16:15:26 UTC
Updated Time
July 15, 2026 at 00:09:15 UTC

Other

Affiliations
Space Stations
-
Vehicles