Back to Missions

STS-76

STS-76 was a Space Shuttle Atlantis mission flown in March 1996 as the third Shuttle docking with the Mir space station. The flight delivered Shannon Lucid to Mir for a long-duration stay and carried SPACEHAB logistics and science equipment, including Biorack investigations, to support the Shuttle-Mir program. Kevin Chilton commanded Atlantis with Richard Searfoss as pilot and Ronald Sega, Michael Clifford, Linda Godwin, and Lucid as mission specialists. During the docked phase, Godwin and Clifford performed the first U.S. spacewalk around the joined Shuttle-Mir complex, testing equipment and techniques for future station assembly work. Atlantis launched from Kennedy Space Center's Pad 39B on March 22, 1996, undocked from Mir on March 29, and landed at Edwards Air Force Base on March 31 after more than nine days in orbit.

STS-76
Follow this mission

Alerts are unavailable because this mission is no longer active.

Identity

Aliases
Atlantis STS-76Shuttle-Mir STS-76Spirit of 76Third Shuttle-Mir DockingSTS 76
Name
STS-76
Status
completed

Details

Astronauts
Description
STS-76 was a Space Shuttle Atlantis mission flown in March 1996 as the third Shuttle docking with the Mir space station. The flight delivered Shannon Lucid to Mir for a long-duration stay and carried SPACEHAB logistics and science equipment, including Biorack investigations, to support the Shuttle-Mir program. Kevin Chilton commanded Atlantis with Richard Searfoss as pilot and Ronald Sega, Michael Clifford, Linda Godwin, and Lucid as mission specialists. During the docked phase, Godwin and Clifford performed the first U.S. spacewalk around the joined Shuttle-Mir complex, testing equipment and techniques for future station assembly work. Atlantis launched from Kennedy Space Center's Pad 39B on March 22, 1996, undocked from Mir on March 29, and landed at Edwards Air Force Base on March 31 after more than nine days in orbit.
End Date
1996-03-31
Landing Site
Launch Site
Outcome
Successfully completed the third Shuttle-Mir docking, transferred Shannon Lucid to begin a long-duration Mir stay and continuous U.S. presence in space, delivered SPACEHAB logistics and ESA Biorack research, and performed the first U.S. EVA around the joined Shuttle-Mir complex.
Program
Space Shuttle program
Start Date
1996-03-22
Vehicle Families

Links

Assets & Meta

Creation Time
July 4, 2026 at 00:41:54 UTC
Updated Time
July 15, 2026 at 00:09:18 UTC

Other

Affiliations
Events
-
Space Stations
Vehicles