RS1 Block 1 was the original flight configuration of ABL's small launch vehicle. The 26.8-metre, two-stage rocket used nine sea-level E2 engines on its first stage and one vacuum E2 engine on its upper stage. Its only launch, Demo-1 in January 2023, ended when the first-stage engines shut down shortly after liftoff and the vehicle fell back near the pad. The 2022 nine-engine design guide rates GTO payload at approximately 320 kg, subject to mission-specific analysis; this was a design capability rather than a demonstrated orbital delivery.
Future launches and major activity directly linked to this vehicle family.
RS1 Block 1 was the original flight configuration of ABL's small launch vehicle. The 26.8-metre, two-stage rocket used nine sea-level E2 engines on its first stage and one vacuum E2 engine on its upper stage. Its only launch, Demo-1 in January 2023, ended when the first-stage engines shut down shortly after liftoff and the vehicle fell back near the pad. The 2022 nine-engine design guide rates GTO payload at approximately 320 kg, subject to mission-specific analysis; this was a design capability rather than a demonstrated orbital delivery.
Future launches and major activity directly linked to this vehicle family.