H-IIA 202 was the standard configuration with two SRB-A solid rocket boosters and no small strap-on boosters. It was used by 35 of the program's 50 flight vehicles from the 2001 test flight through the final F50 mission in 2025.
Future launches and major activity directly linked to this vehicle family.