PSLV-C39, a PSLV-XL vehicle, launched IRNSS-1H from Satish Dhawan Space Centre on August 31, 2017. The mission was unsuccessful because the payload fairing did not separate during second-stage flight, leaving IRNSS-1H trapped inside even though the remaining stages continued to operate.